Middle East Supply DeskProject specifications · Export documentation · Responsive quotationellen@waterproofingbest.com

Bituminous coatings

SRC — Spray-Applied Rapid-Setting Rubber Bitumen Coating

Two-component spray-applied rubber bitumen waterproofing combining polymer-modified asphalt emulsion with a demulsifier. Suited to large areas and complex shapes where dedicated spray application is specified.

SRC Spray-Applied Rapid-Setting Rubber Bitumen Coating

Product image

Recommended applications

Basements, roofs and specified industrial or water-related structures.

Key product data

PacksA: 50 kg; B: 10 kg
Reference consumption at 1 mm1.7 ± 0.1 kg/m²
Application temperature5–40°C

Reference information from the supplied product data. Performance and consumption depend on the grade and application conditions; confirm details in the batch documentation.

Standards & test methods

Reference standards and test methods stated in the product technical data.

Property / conditionTechnical requirement / reference value
TDS standard referenceQ0783 WHY006-2020
AppearanceBlack and brown
VOC: source descriptionSolvent-free (VOC-free); numeric result not supplied
Solids content≥55%
Heat resistance140 ±2°C; No flowing, sliding or dripping
Impermeability: 0.30 MPa, 30 minNo leakage
Bond strength: dry substrate≥0.40 MPa
Bond strength: wet substrate≥0.40 MPa
Gel time≤10 s
Drying time≤24 h
Elastic recovery≥90%
Nail-bar watertightnessNo leakage
Water absorption: 24 h≤2.0%
Tensile strength, spray: standard condition1.4 ±0.2 MPa
Elongation: standard condition1200 ±100%
Elongation after alkali treatment≥800%
Elongation after acid treatment≥800%
Elongation after salt treatment≥800%
Elongation after heat treatment≥800%
Elongation after uv treatment≥800%
Water resistance: appearanceNo cracking, delamination, blistering or damage
Water resistance: bond-strength retention≥80%

References reproduce the editions listed in the product data. Confirm the required edition, selected grade and supporting test report for consultant approval.

Application & selection notes

Do not add water to Component A. Component B dilution and spray proportioning must follow the complete supplied method and be checked on a trial area. Protect fresh membrane from intense sunlight and prevent moisture-related blistering.

For hot, dry site conditions, check substrate temperature, moisture, working time and curing before application. The heat resistance of a cured membrane does not permit installation outside the application limits in its TDS.

Specify for Saudi Arabia, UAE & GCC projects

Send the project location or destination port, application, substrate, required thickness, area in m², quantity and delivery schedule. Request the selected grade, export packing, TDS and batch documentation for consultant review. Manufactured in China; project approvals are reviewed for each enquiry.

Contact the export team